Ground Water Remediation Solution – Case Study

10 Feb 2016 | Family

The client had an extensive problem with ground water at a site on the East Coast of Australia at risk of contaminating a main river system within 100 yards from the site.

The mobile recycling unit was dispatched to site and setup and operational within 3 hours of delivery.

The contaminated groundwater consisted of sand and clay mix.  You will see in this video the mobile system effectively removed all of the sand and clays and the water was utilised in the project as recycled water.

The volumes processed each 10 hour day was 70,000Litres and ran for 40 days.

For more information, take a look at our wastewater filtration products.